Back to Portfolio
Industrial
Completed

Sharda Motors Industrial Infrastructure Project Industrial Project

Professional industrial infrastructure development project at Sanand, Ahmedabad, Gujarat. Delivered with engineering precision and quality workmanship.

Value

₹1.15 Cr

Year

2018–2019

Status

Completed

Industry

Industrial Automation & Automotive Components Manufacturing

Location

Sanand

Sharda Motors Industrial Infrastructure Project - Industrial Automation & Automotive Components Manufacturing project infrastructure by Siddhi Industrial Services
Professional engineering and infrastructure execution at Sanand, Ahmedabad, Gujarat.

Project Overview

Siddhi Industrial Services executed a critical industrial infrastructure development project for Sharda Motors, a prominent name in industrial automation and automotive component manufacturing, at their Sanand facility in Ahmedabad. The project, valued at ₹1.15 crore, was carried out between 2018 and 2019, focusing on enhancing the operational backbone of the manufacturing plant. The client required specialized civil works that could support high-precision automation lines and integrated MEPF (Mechanical, Electrical, Plumbing, and Firefighting) systems, demanding a contractor with deep technical expertise in industrial environments. Our engineering approach was centered on precision and structural longevity. We began with the complex task of designing and constructing foundations for MEPF systems, which required careful coordination with the plant's mechanical layouts to ensure zero-clash installation of heavy utility infrastructure. This was followed by the construction of heavy-duty internal RCC roads, engineered to withstand continuous multi-axle vehicle traffic essential for the automotive supply chain. Beyond the core manufacturing shell, we developed specialized storage yards and modernized the facility's utility blocks, including high-standard industrial toilet blocks designed for durability and hygiene. The successful completion of this project resulted in a significant upgrade to Sharda Motors' site infrastructure, providing them with a robust, efficient, and future-ready facility that supports their large-scale manufacturing output in the heart of Gujarat's industrial corridor.

Engineering Challenges

  • !

    Precision Foundation for MEPF: Constructing foundations for high-density MEPF systems within an active plant required sub-millimeter accuracy to avoid interference with existing underground utilities and production lines.

  • !

    Dynamic Load Management: The storage yard and internal roads needed to be engineered for varying static and dynamic loads from both manufacturing equipment and heavy logistical vehicles.

  • !

    Timeline Sync: Aligning the construction phases with the client's production downtime windows necessitated an accelerated execution schedule without compromising on clearing periods for the RCC works.

Our Construction Solution

3D Site Mapping: We employed advanced site surveying to map existing underground networks, ensuring the MEPF foundations and cable trenches were executed with zero utility damage.

High-Performance RCC Mixes: Utilized M30 grade concrete with specialized additives for the internal roads and MEPF foundations to ensure rapid strength gain and high resistance to industrial wear.

Integrated Project Management: Deployed a multi-disciplinary site team to manage the parallel execution of the landscape, utility blocks, and road works, optimizing the overall project timeline.

Case Study Gallery

Detailed visual documentation of the project execution phases.

Heavy-duty industrial infrastructure and MEPF foundations at Sharda Motors Sanand

Specialized civil engineering for industrial automation and logistics.

Planning Your Next Industrial Project?

Partner with Siddhi Industrial Services for industrial buildings, factory development, RCC works, infrastructure projects and turnkey industrial construction across Sanand, Ahmedabad and Gujarat.