Hitachi Hi-Rel Industrial Facility Expansion Project Industrial Project
Professional industrial infrastructure development project at Chharodi, Sanand, Ahmedabad, Gujarat. Delivered with engineering precision and quality workmanship.
Value
₹2.20 Cr
Year
2024–2025
Status
Ongoing
Industry
Industrial Power Electronics Manufacturing
Location
Chharodi
Project Overview
Engineering Challenges
- !
Operational Continuity: Executing heavy civil works and extensions while the existing manufacturing plant maintains full production capacity.
- !
Complex Drainage Integration: Designing and installing a new Storm Water Drainage (SWD) network that integrates with existing site levels to ensure zero waterlogging.
- !
Utility Logistics: Managing multiple infrastructure upgrades (locker rooms, security cabins, parking) simultaneously within a live industrial environment.
Our Construction Solution
Phased Construction: Implementing a strict phased schedule to ensure that construction noise and dust do not impact sensitive power electronics assembly areas.
Advanced Surveying: Utilizing high-precision leveling for the SWD and culvert construction to guarantee efficient water flow and long-term site stability.
Dedicated HSE Oversight: Deploying full-time safety officers to manage the safe movement of construction equipment alongside plant personnel and logistics vehicles.
Case Study Gallery
Detailed visual documentation of the project execution phases.
High-strength RCC roads designed for heavy logistical transport.
Relevant Industrial Expertise
Planning Your Next Industrial Project?
Partner with Siddhi Industrial Services for industrial buildings, factory development, RCC works, infrastructure projects and turnkey industrial construction across Sanand, Ahmedabad and Gujarat.