Back to Portfolio
Industrial
Completed

ALP Nishikawa Industrial Infrastructure & Manufacturing Facility Development Project Industrial Project

Professional industrial infrastructure development project at Khoda, Chharodi, Ahmedabad, Gujarat. Delivered with engineering precision and quality workmanship.

Value

₹0.85 Cr

Year

2020–2021

Status

Completed

Industry

Automotive Parts Manufacturing

Location

Khoda

ALP Nishikawa Industrial Infrastructure & Manufacturing Facility Development Project - Automotive Parts Manufacturing project infrastructure by Siddhi Industrial Services
Professional engineering and infrastructure execution at Khoda, Chharodi, Ahmedabad, Gujarat.

Project Overview

Siddhi Industrial Services successfully delivered a specialized industrial infrastructure and facility development package for ALP Nishikawa’s automotive parts manufacturing plant in Khoda, Chharodi, Ahmedabad. This project, valued at ₹0.85 crore and executed during the 2020-2021 period, was a critical expansion designed to support high-precision manufacturing processes required for automotive sealing systems. The client required a structural environment that could accommodate heavy-duty vibrating machinery while ensuring a safe and efficient workflow for their workforce. Our engineering approach prioritized the execution of high-grade machine foundations, utilizing reinforced concrete with specific vibration-dampening properties to ensure zero-tolerance stability for the manufacturing units. The project scope encompassed the complete site development, including the construction of a reinforced compound wall for perimeter security and the development of a modern administrative building integrated with the facility's core operations. We implemented a comprehensive Storm Water Drainage (SWD) network, engineered to handle the regional rainfall patterns and protect the sensitive production zones from water ingress. Additionally, the execution included organized parking area development and industrial landscaping, creating a professional and functional environment. The outcome of this project is a technically sound, high-performance manufacturing facility that meets ALP Nishikawa’s global safety and quality standards.

Engineering Challenges

  • !

    Vibration Management: Designing foundations for high-speed automotive part machinery required specialized RCC mixes to prevent structural fatigue.

  • !

    Site Drainage Integration: Integrating a new Storm Water Drainage network into an existing plot topography while ensuring zero-backflow during peak monsoons.

  • !

    Workforce Logistics: Constructing the administrative block and parking facilities without interrupting the client’s existing manufacturing logistics.

Our Construction Solution

Engineered Foundations: Employed high-strength M30 concrete with specialized steel reinforcement maps for critical machine pits.

Hydrological Grading: Utilized digital site surveying to establish precise gradients for the SWD network, ensuring gravity-based water discharge.

Phased Infrastructure: Sequenced the compound wall and admin building construction to maintain secure access points throughout the execution phase.

Case Study Gallery

Detailed visual documentation of the project execution phases.

Precision machine foundations and infrastructure at ALP Nishikawa Chharodi

Engineered civil works for automotive manufacturing excellence.

Planning Your Next Industrial Project?

Partner with Siddhi Industrial Services for industrial buildings, factory development, RCC works, infrastructure projects and turnkey industrial construction across Sanand, Ahmedabad and Gujarat.